How much concrete do I need?

Concrete is ordered by volume but sold by the bag or the truckload. Here is the arithmetic that connects your tape measure to the number on the invoice.

Want the answer without the math? The concrete calculator does this in one screen — enter length, width and thickness, and it returns cubic yards plus bags.

The three-step calculation

  1. Cubic feet = length (ft) × width (ft) × thickness (ft). If thickness is in inches, divide by 12 first.
  2. Cubic yards = cubic feet ÷ 27, because a yard is 3 × 3 × 3 ft.
  3. Bags = cubic feet ÷ the yield printed on the bag.

That is the whole method. The only inputs that vary are the dimensions and the bag yield, and the yield is always on the label.

Worked example: a 10 × 12 patio

StepCalculationResult
Area10 ft × 12 ft120 sq ft
Thickness in feet4 in ÷ 120.333 ft
Volume120 × 0.33340 cu ft
Volume in yards40 ÷ 271.48 cu yd
80 lb bags40 ÷ 0.6067 bags
With 5% spillage67 × 1.0570 bags

Bag yields and bags per yard

BagYieldBags per cubic yardWeight per yard
40 lb0.30 cu ft903,600 lb
60 lb0.45 cu ft603,600 lb
80 lb0.60 cu ft453,600 lb

Every size adds up to about 3,600 lb per yard, because it is the same mix in different bags. Choose the bag you can carry and mix in five minutes, not the one that minimises the count.

Slab thickness by project

ProjectThicknessReinforcement
Stepping stones, garden path3–4 inNone
Patio, shed floor4 inMesh optional
Hot tub pad5–6 inMesh or rebar
Driveway, cars5 inRebar or mesh
Driveway, trucks or RV6 in#4 rebar grid

Thickness is the cheapest insurance against cracking. Going from 4 to 5 inches adds 25% to the material cost of a small slab and roughly doubles its load capacity.

Bags or ready-mix?

The break-even is usually somewhere between 1 and 2 cubic yards, and it depends almost entirely on delivery fees.

VolumePractical choiceWhy
Under 0.5 cu ydBags45 bags or fewer — mixable by hand in an afternoon
0.5–1.5 cu ydBags or a mixer rental45–68 bags; rent a mixer and two people
1.5–3 cu ydReady-mix, watch short-load feesMany suppliers charge extra below 3 yards
Over 3 cu ydReady-mixBags stop being physically practical

Always ask for the delivered price, including the short-load fee and any Saturday surcharge, before comparing it to bags. The per-yard price on a quote is rarely the number you pay.

How much extra should I order?

Five percent for a formed slab on a flat, compacted base. Ten percent if the sub-base is uneven, the forms are informal, or you are pouring against soil. Concrete that runs short mid-pour leaves a cold joint you cannot hide — and a second delivery is far more expensive than the extra half yard.

Common mistakes

  • Measuring thickness in inches and forgetting to convert. A 4 inch slab is 0.333 ft, not 4 ft. This is the single most common error and it is off by a factor of 12.
  • Forgetting the base. Concrete needs 4 inches of compacted gravel underneath, which is a separate order entirely.
  • Ordering bags for a driveway. A 20 × 20 driveway at 5 inches is 6.2 cubic yards — 278 bags. Rent a truck, not a cart.
  • Mixing in the sun. Concrete sets faster in heat; keep bags shaded and mix in smaller batches.